Talk:Warwick, RI Lead Hazard Reduction Program

From Green Policy
Revision as of 23:03, 23 February 2008 by Tsmith (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

[http://www.warwickri.gov/archives/pressreleases/2007/PR100207.html Federal HUD again lauds city for its lead hazard reduction program’s performance

Mayor Scott Avedisian announced today that the Warwick Lead Hazard Reduction Program (WLHRP) has earned another “green” ranking from the U.S. Department of Housing and Urban Development (HUD). The WLHRP is administered by the city’s Office of Housing & Community Development.

Each quarter, HUD assesses a variety of factors to determine an agency’s overall performance based on its three-month report and grant work plan. These factors include meeting established benchmarks such as completing lead hazard control in residential units and progress in drawing down grant funds relative to work performed.

The green designation – HUD’s highest – means that the city is meeting and/or exceeding standard, primary benchmarks. Specifically, the city is ahead in target units completed and target line of credit control system drawdowns. The program’s overall performance is good, HUD said.

The program began in 2003, with a $1.8-million, three-year grant from HUD. Last September, HUD awarded the city a second, three-year grant of $2.1 million – the largest single award in city history – to continue the program.

The goal is to reduce the exposure of Warwick’s children under six years of age to the hazards of lead paint; increase public awareness about the hazards of lead paint; promote safe and effective methods of reducing lead paint hazards; provide grants/loans to homeowners and landlords to reduce lead in low/moderate income households; and to collect information on the most cost-effective ways to reduce lead paint hazards.

To date, a total of 127 units were made lead-safe through funding from the 2003-06 grant. The second grant cycle is effective through 2009, with 125 units to be made lead-safe. To date, work on six units has been completed.